BLOCK II AREA
Historical
Block-II Area came into existence in the year 1983-84 primarily for the production of Coking Coal with the inclusion of the Nudkhurkee OCP, Benedih OCP, Jamunia OCP & the opening of Block-II Project. The Block-II Project was funded by World Bank. The project was envisaged to meet the growing demand of Coking Coal in the country.
In the year 2002-03 Benedih OCP, Nudkhurkee OCP & Block-II OCP (Coking coal) were amalgamated and Block-II OCP (Non-coking) Project came into existence. In 2003-04 Madhuban Coal Washery also came under the administrative control of Block-II Area.
Location
Block-II Area is situated about 40 KM west of Dhanbad & its
Latitude – 23º 47’30” to 23º 46’30”
Longitude – 86º 13’30” to 86º 10’30”
The Administrative Office of the General Manager of Block-II Area is situated in the palace of the Erstwhile Maharaja of Nawagarh Estate near the present Dumra Bus stand at a distance of 40 km West from BCCL headquarters, Koyla Bhawan, Dhanbad. All the projects under Block-II Area are situated 3-5 km away from the Area Office.The distances of the Area office from nearby important places are as :-
40 km away from Dhanbad Railway station.
10 km away from Gomoh Railway station
4 km away from local railway station like Phulwartand and Khanudih(Baghmara).
Public conveyance
The place is well connected by road with Dhanbad, Gomoh, Chandrapura & Bokaro.Public transport facility is available to all the above places.
No of Collieries:
Departmental Hired HEMM Patch
BLOCK–II ABOCP Mine Benedih Patch and New Benedih Patch
Details of Leasehold area
Total leasehold area is 906.63 Hectares.
Area affected by Fire & subsidence & its dealing
Total area affected by fire & subsidence:-
Area affected by fire is eastern part of Block-II OCP Mine upto X Seam which is approximately 14.5 Hectares.Fire patches are under operation to dig out the fiery coal as well as non-firey coal.
Workshop facilities:
Block-II Area has workshop facilities located at: –
1. Block-II OCP Dumper Workshop
2. Jamunia Dumper Workshop
3. Regional Repair Workshop (RRWS)
BLOCK–II OCP DUMPER WORKSHOP
Maintenance & Repairs of Dumpers, Pay-loaders, Cranes & other workshop equipment’s are carried out.The works carried out here include washing, greasing, daily maintenance, periodical maintenance & running repairs.
Dumpers at maintenance shed
The facilities available here are:
a) Diesel Dispensing unit (Fixed unit)
b) Movable diesel dispensing facility (Diesel Bouzer)
c) High pressure washing facility with ramp.
d) Pneumatic grease pumps for greasing
e) Centralized lubrication system
f) Tyre Inflation facility
g) Battery charging facility
h) Distilled water plant
i) Welding & Gas cutting arrangement
j) Hydraulic jacks & pressure gauges
k) Mobile servicing units (Maintenance Vans)
JAMUNIA DUMPER WORKSHOP
Due to space constraint at Block-II workshop msain tenance & repair of HEMM like dumpers, dozers etc are also carried out at Jamunia Workshop.
REGIONAL REPAIR WORKSHOP
This workshop caters to the major repair works of ABOCP Mine. The jobs mainly carried out here are as hereunder:
1. Heavy mechanical repairs
2. Reclamation works
3. Manufacturing works involving turning, machining, milling, slotting etc except casting, forging, heat treatment or annealing works.
4. Electrical maintenance repair works of motors, generators like assembling, changing of internal components, minor rewinding, insulation & varnishing works.
5. Assembling & component changing of mine pumps
6. Rehabilitation works of Dozers, Drills & Dumpers
7. Maintenance works of Cranes & Graders
The facilities available at RRWS for the various repair works include:
a) BICCO Lathe machines for handling heavy jobs
b) HMT make lathe machines for handling medium/small jobs
c) HMT make milling machine
d) HMT make radial drills
e) BATLIBOI Make shaper machine
f) ACCUMAX Make standard vertical drill
g) Power hacksaws
h) HMT make surface grinder
i) Overhead Cranes
j) Hydraulic jacks
k) Welding/gas cutting sets
l) Portable grinders, drills
Future planning
One Underground Coal mine of 0.45MTY capacity is going to be started in near future in the Area involving continuous miner technology.
Tender for Highwall Mining in Jamunia Section has already been floated.
Proposed New Nudkhurkee Patch with partial Overburden & Coal excavation by Deployment of Vertical Rippers has been floated.
One 05 Million Te New Madhuband NLW Washery operation started recently.
Production in last Five years Block-III Area (In Lakh Ton) & Profit/Loss | |||||
YEAR | COAL (Lte) | OBR (Lcum) | Dispatch (Lte) | Profit/Loss (Rs Lakh) | CPT (Rs) |
2017-18 | 30.27 | 60.46 | 30.12 | 5728.89 | 1746.22 |
2018-19 | 21.70 | 37.67 | 23.76 | 11836.86 | 1976.11 |
2019-20 | 16.54 | 55.05 | 17.00 | 14881.48 | 2670.69 |
2020-21 | 26.46 | 118.53 | 23.95 | 20688.36 | 1726.59 |
2021-22 | 37.02 | 174.83 | 38.95 | 41528.52 | 1651.51 |
PAYMENT OF GOVERMENT DUES (Rs.in Lakhs) | |||||||
YEAR | PAY TO STATE GOV | PAY TO CENTRALGOV | |||||
ROYALTY | VAT | CST | GST | GST CESS | S.E.D | C.E.CESS | |
2017-18 | 8941.79 | 117.25 | 358.06 | 2514.96 | 9631.28 | 0.53 | 2377.58 |
2018-19 | 7171.66 | 0 | 0 | 3277.00 | 9227.46 | 0 | 0 |
2019-20 | 7482.02 | 0 | 0 | 3130.87 | 6500.95 | 0. | 0 |
2020-21 | 8666.21 | 0 | 0 | 3545.68 | 8646.97 | 0 | 0 |
2021-22 | 14021.49 | 0 | 0 | 5809.79 | 14244.56 | 0 | 0 |
Manpower of Block-II Area (as on 31.03.2022)
Category | Male | Female | Total |
Executive | 101 | 1 | 102 |
Monthly Rated | 287 | 16 | 303 |
Daily Rated | 1223 | 105 | 1328 |
Piece Rated | 0 | 0 | 0 |
Trainees | 19 | 1 | 20 |
Total | 1630 | 123 | 1753 |
There is one mine namely Amalgamated Block-II OCP, two railway sidings and one washery (MCW)with its separate railway siding is currently operating under Block-II Area. Their breakup is listed below :-
Area Office | ABOCP | MCW | |||||||
Category | Male | Female | Total | Male | Female | Total | Male | Female | Total |
Executive | 36 | 0 | 36 | 59 | 1 | 60 | 6 | 0 | 6 |
Monthly Rated | 61 | 5 | 66 | 138 | 9 | 147 | 88 | 2 | 90 |
Daily Rated | 187 | 46 | 233 | 845 | 46 | 891 | 191 | 13 | 204 |
Piece Rated | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Trainees | 7 | 1 | 8 | 6 | 0 | 6 | 6 | 0 | 6 |
Total | 291 | 52 | 343 | 1048 | 56 | 1104 | 291 | 15 | 306 |
Human Resource Development
For the development of professional and personal skill sets of staffs belonging to each category, various training programs are organized at various institutions within BCCL and CIL.Executives, staffs & workers of different units of Block-II Area are given training
1. Indian Institute of Coal Management (IICM) Ranchi: All the executives undergo various training programs at IICM which is a state of art institution having highly qualified faculties.
2. Excavation and Mechanization Training Institute (EMTI) Dhansar: EMTI provides training to operators for HEMM and underground mine mechanization for critical category like, Dragline Operators, Dumper Operators, Shovel Operators, and Dozer Operators.
3. MTI & SDI, Human Resource Development Department Kalyan Bhawan, Dhanbad: It provides various soft skills development for executives as well as non-executives in various managerial, jobs related and personal traits.
4. Group Vocational Training Centre (GVTC), Barora Area: Newly appointed workers/staffs and contractor workers are given training at GVTC, Barora.Refresher training is also provided as per VT Rule.
E–initiatives
Block-II area has taken a keen interest in making its working efficient and transparent. In this regard several activities have been initiated. ERP SAP has already been implemented at Block-II Area w.e.f Nov’2021.
Area Committees
There are several committees in the area which guide and monitor the overall working in their own domain as well as in general.
1. The Area Consultative Committee (ACC): deals with overall performance evaluation and exploration of areas for improvement for production and other allied activities. It comprises of Area General Manager as its Chairperson and all the Head of Departments alongwith representative of various labour union. The list of union representatives is as follows:
Name of ACC Members
Sl. No. | NAME | UNION |
|
1. | Sri Gopal Mishra | JMS | 8210608099 |
2. | Sri Tulsi Saw | UCWU | 7979964168 |
3. | Sri Gopal Chandra Gope | KIMP | 9608146147 |
4. | Sri R P Singh | BCKU | 8229043266 |
5. | Sri Uttam Pandey | DCKS | 7004039366 |
2. Welfare Committee:
Name of Welfare Committee Members
Sl no. | Name | Union | Phone No, |
1. | Sri Chandra Shekar Rai | DCKS | 9931523225 |
2. | Sri Gopal Mishra | JMS | 8210608099 |
3. | Sri Baijnath Yadav | UCWU | 9431319975 |
4. | Sri Anil Kr. Sinha | BCKU | 9135247268 |
5. | Sri KeshoPashwan | KIMP | 9341522398 |
3. House Allotment Committee:
Name of House Allotment Committee Members
Sl no. | Name | Union | Phone No |
1. | Sri Gopal Mishra | JMS | 8210608099 |
2. | Sri Chandra Shekhar Rai | DCKS | 9931523225 |
3. | Sri Suresh Chauhan | UCWU | 8210785865 |
4. | Sri SK Bishwakarma | KIMP | 9835234641 |
5. | Sri PuranMahto | BCKU | 7370814334 |
Calendar of 2021–22
For smooth functioning of all the department and continuous improvement good IR is a key actor.Periodic meetings are held with Central Trade Unions at unit as well as Area level for suggestions and grievance redressal.The calendar of 2021-22 for these meetings at Area level is:
Sl. No. | Date of meeting | Trade Union |
1. | 12/04/2021 | UCWU |
2. | 08/09/2021 | JMS |
3. | 16/12/2021 | KIMP |
4. | 24/12/2021 | DCKS |
5. | 13/03/2022 | UCWU |
CSR clinics (सरोकार)
One hour daily excluding Sundays & Public Holidays is dedicated to CSR Clinics for health advice given free of cost by doctors at Matigarha & Bhimkanali dispensaries
Wellness Clinic (मुस्कान)
Advice is given two days in a week regarding life style management for patients of hypertension, heart disease, diabetes, alcohol & drug abuse, etc in each dispensary.
R&R Status
Nudkharkee & Benedih village Rehabilitated at Bakaspura and Bada Pandeydih respectively with all civic amenities. At present all efforts are going on to Rehabilitate Kessergarh village as per R&R Policy.
Sports & Cultural Activities
Annual Sports is being conducted in joint effort with Barora Area, Govindpur ansd Katras Area every year & cultural activities like painting & drawing competitions, art & craft competitions being held.
Medical facilities
Two Dispensaries:
1. Matigarha Dispensary
2. Bhimkanali Dispensary
One Mini-dispensaries:
1) MCW Mini Dispensary, MCW
No. of Doctors: 02, Pharmacists: 04, Ambulance: 03. One mobile medical van for CSR village health camp. Primary health care service given in OPD, Secondary health care, Indoor service & PME of patient are being done at Regional Hospital, Baghmara. For referral cases, patients are referred to Central Hospital Dhanbad.
First Aid training, health awareness programme are regularly organized.
Sl No. | Description | Date | Location | No. of beneficiaries |
1. | 50 years above aged Health Camp and Personal Counselling Camp | 26.08.2021 | At 14 No., Amalgamated Block-II OCP | 81 |
02.03.2022 | 57 | |||
29.04.2022 | At P.O. Office, Amalgamated Block-II OCP | 54 | ||
30.05.2022 | 22 | |||
2. | Health Check-up Camps | 20.02.2020 | Matigarha | 150 |
06.03.2020 | Kessurgarh | 194 | ||
07.03.2022 | Khanudih | 198 |
Residential Buildings:
The present township-wise status of residential buildings at Block-II Area is as follows:
Sl No. | Colony | D Type | C Type | B Type | A Type | NHS/MQ | Others | Total No. | |
1. | Quarters in Non-Coal Bearing Area | NNTS | 19 | 160 | 242 | 0 | 0 | 0 | 421 |
2. | BKTS | 0 | 0 | 48 | 276 | 620 | 0 | 944 | |
3. | MTS | 0 | 0 | 44 | 44 | 1310 | 78 | 1476 | |
4. | DTS | 0 | 0 | 0 | 0 | 804 | 0 | 804 | |
5. | Quarters in Coal Bearing Area | DG Colony | 0 | 1 | 6 | 43 | 0 | 0 | 50 |
6. | Benedih | 0 | 0 | 0 | 0 | 90 | 0 | 90 | |
7. | Khilan Dhowra | 0 | 0 | 0 | 0 | 0 | 69 | 69 |
Water Supply :
Raw water Source : Jamunia River
Raw water is drawn from intake well near Dam on Jamunia River. There is one number water treatment plant of 3.5 MGD capacity.Drinking water from JWTP is supplied to Matigarha Colony, Bhimkanali, Nudkhurkee & Nehru Nagar (Harina Colony) of Block-II Area. At Dugdha Township ground water is drawn by 5 nos submersible pumps at different locations in which water is supplied to different blocks either directly from submersible pumps or via overhead water tank.For D.G Colony & Benedih Colony water is being supplied through boreholes.
- Construction of Chath Ghat at Sarbandh pond at Dumra village. Making Chath Ghat at dam site at Sector-VII Marigarh.
Construction of steps for Goverdhan hill at Matigarh village near Sector-VI & VII.
Renovation of community hall at Sector-III Matigarh. Drilling & installation of 6 nos. hand pumps at
a)Bara Pandeydih
b)Hanuman Mandir, Harina
c)Rath Tand village
d)Dhobi Tola Village
e)Luti Pahari village
f)Tracker stand Baghmara.
g) Addition & alteration work of community centre/challa at rehabilitation site, Bakaspura.
h) Development work of community hall at Nudkhurkee village.
Drilling & installation of 4 nos. hand pump at
a)Netaji Subhash Bose School, Dumra
b)MatigarhBastee
c)Near Durga Mandir Baghmara
d)Bara Pandeydih Village.
SAFETY & TRAINING
Safety is a prime concern of the organization so is for Block-II Area.The Area has safety committees at Area level as well as at its unit level.The committees comprise of executives as well as union representatives as per statute.
Area Level Safety Committee Members(Executives)
Sl. No. | Name of Executive | Designation |
1. | Sri Chittaranjan Kumar | General Manager, B-II Area |
2. | Sri Suresh Prajapati | Area Safety Officer, B-II Area |
3. | Sri KK Singh | P.O. , Amalgamated Block-II OCP |
4. | Sri Pranjal Pandey | Area Manager Civil |
5. | Sri P N Sharma | Area Manager Excavation |
6. | Sri Shambhu Saran | Area Manager E&M |
7. | Sri Suryakant Sinha | Area Manager Purchaser(MM) |
8. | Sri KK Dutta | Manager, Amalgamated Block-II OCP |
9. | Sri Satyaprakash Singh | Area Medical Officer |
10. | Sri BishwaroopBanarjee | Safety Officer, Amalgamated Block-II OCP |
11. | Sri Alok Kumar | Engineer-In-Charge, Amalgamated Block-II OCP |
Area Level Safety Committee Members(Union Representatives)
Sl. No. | Name | Union | Phone Number |
1. | Krishna Raut | JMS | 9835361215 |
2. | Ravindra Singh | KIMP | 9471185062 |
3. | NakulMahto | BCKU | 9835579919 |
4. | Tulsi Saw | UCWU | 7979964168 |
5. | Ramanth Thakur | DCKS | 9431509509 |
The periodic medical examinations of the employees are conducted to detect any medical complications. It helps in shaping the good health of employees and improving productivity and safety for the organization.
PME (Periodic Medical Examination) of employees | |
Year | PME Achieved |
2017 | 23 |
2018 | 32 |
2019 | 62 |
2020 | 95 |
2021 | 173 |
Executives, staffs & workers of different units of Block-II Area are given training at IICM Ranchi, EMTI Dhansar, MTI & SDI Kalyan Bhawan and GVTC at Barora Area. Contractor’s workers are given training at Barora VTC.
Unit | 2019 | 2020 | 2021 | |||||||||
Refresher | SpecialTraining | ContractWorkers | Refresher | SpecialTraining | ContractWorkers | Refresher | SpecialTraining | ContractWorkers | ||||
Target | Trained | Target | Trained | Target | Trained | |||||||
Amalgamated Block-II OCP | 220 | 227 | 99 | 62 | 200 | 164 | 72 | 35 | 240 | 206 | 111 | 26 |
Total | 220 | 227 | 99 | 62 | 200 | 164 | 72 | 35 | 240 | 206 | 111 | 26 |
Accident Statistics of Block-II Area
Year | Fatal | Serious | Reportable | Near Miss |
2017 | 0 | 1 | 7 | NA |
2018 | 0 | 0 | 5 | 5 |
2019 | 1 | 2 | 3 | 4 |
2020 | 0 | 0 | 0 | 4 |
2021 | 0 | 2 | 2 | 1 |
BCCL: BLOCK-II AREA | ||||||
RANK-WISE LIST OF EXECUTIVES OF AREA OFFICE AS ON 01.04.2014 | ||||||
BLOCK-II AREA OFFICE | ||||||
SL | NAME OF EXECUTIVE | DESIGNATION | Discipline | PERS.No. | GRADE | POSTING |
1 | SOUMEN CHATTERJEE | GEN. MANAGER | MINING | 90027947 | E-8 | AREA |
2 | R. BHATTACHARJEE | CHIEF MANAGER | EXCAVATION | 90050808 | E-7 | AREA |
3 | S.P SINGH | CHIEF MANAGER | E & M | 90180233 | E-7 | AREA |
4 | S.K MANDAL | CHIEF MANAGER | E & M | 90124132 | E-7 | MADHUBAN D.G |
5 | S.D DHRUVA | CHIEF MANAGER | MINING | 90126798 | E-7 | AREA |
6 | S.K PRUSTI | CHIEF MANAGER | MINING | 90118480 | E-7 | AREA |
7 | BINOD MODI | CHIEF MANAGER | CIVIL | 90181751 | E-7 | AREA |
8 | BIBHUTI BHUSHAN | CHIEF MANAGER | PURCHASE | 90089145 | E-7 | AREA |
9 | A.K MANDAL | CHIEF MANAGER | PERSONNEL | 90041468 | E-7 | AREA |
10 | A. K. CHOUDHARY | CHIEF MANAGER | FINANCE | 90036229 | E-7 | AREA |
11 | ASHISH KR. DUTTA | CHIEF MANAGER | EXCAVATION | 90177460 | E-7 | RRWS |
12 | C. BANDOPADHYAY | CHIEF MANAGER | E&M | 90099912 | E-7 | AREA |
13 | S.S THAKUR | SR.MANAGER | EXCAVATION | 90050385 | E-6 | RRWS |
14 | VED PRAKASH | SR.MANAGER | PERSONNEL | 90077603 | E-6 | AREA |
15 | R.S PRASAD | SR.MANAGER | FINANCE | 9005779 | E-6 | AREA |
16 | ARBIND KR. SINGH | SR.MANAGER | EXCAVATION | 90063131 | E-6 | RRWS |
17 | M.K SETH | SR.MANAGER | EXCAVATION | 90057158 | E-6 | AREA |
18 | ARUN KUMAR | SR MANAGER | EXCAVATION | 90051599 | E-6 | AREA |
19 | A.K.JHA | SR.MANAGER | FINANCE | 90058132 | E-6 | AREA |
20 | T.S.CHOUHAN | MANAGER | MINING | 90067058 | E-5 | AREA |
21 | SUJIT KR.PAL | DY.MANAGER | FINANCE | 90057720 | E-4 | AREA |
22 | S.S.PRASAD | DY. MANAGER | FINANCE | 90138611 | E-4 | AREA |
23 | R.K SAHU | ASST.MANAGER | SURVEY | 90053125 | E-3 | AREA |
24 | KUMARI ANUPAMA | ASST. MANAGER | PERSONNEL | 90287046 | E-3 | AREA |
25 | GAURAV | ASST.MANAGER | E & M | 90297292 | E-3 | AREA |
26 | DEEPAK KUMAR | ASST. MANAGER | CIVIL | 90274689 | E-3 | AREA |
27 | V. RAJU | ASST MANAGER | FINANCE | 90288176 | E-2 | AREA |
28 | PRANAY GARG | MT | E & M | 90302860 | E-2 | MADHUBAN DG |
29 | K.C BANDOPADHYA | SUB.ENGINEER | EXCAVATION | 90264920 | E-2 | RRWS |
30 | H. JAISWAL | MT | FINANCE | 90317322 | E-2 | AREA |
31 | RAHUL KUMAR | MT | FINANCE | 90321522 | E-2 | AREA |
32 | URMI JAIN | MT | PERSONNEL | 90311473 | E-2 | AREA |
33 | MOHD IRSHAD ANSARI | MT | SYSTEM | 90306606 | E-2 | AREA |
34 | A. BANDOPADHYAY | SUB.ENGINEER | E & M | 90264417 | E-1 | RRWS |
35 | S. K. DUTTA | SUB.ENGINEER | EXCAVATION | 90255654 | E-1 | AREA |
BOCP MINES | ||||||
SL | NAME OF EXECUTIVE | DESIGNATION | Discipline | PERS. No. | GRADE | POSTING |
1 | M. S. DOOT | CHIEF MANAGER | MINING | 90128562 | E-7 | BOCP MINES |
2 | R.A. TIWARY | CHIEF MANAGER | EXCAVATION | 90133729 | E-7 | BOCP MINES |
3 | LAHAR SARKAR | CHIEF MANAGER | EXCAVATION | 90035528 | E-7 | BOCP MINES |
4 | DR.K. C. CHOUDHARY | CMO | MEDICAL | 90173162 | E-7 | BOCP MINES |
5 | H.L SAW | CHIEF MANAGER | EXCAVATION | 90133471 | E-7 | BOCP MINES |
6 | A.K. JHA | CHIEF MANAGER | EXCAVATION | 90107707 | E-7 | BOCP MINES |
7 | A. K. RAI | CHIEF MANAGER | EXCAVATION | 90133414 | E-7 | BOCP MINES |
8 | ARVIND KUMAR | SR. MANAGER | MINING | 90073578 | E-6 | BOCP MINES |
9 | RAVI PRAKASH | SR.MANAGER | EXCAVATION | 90069493 | E-6 | BOCP MINES |
10 | ANIL KUMAR VERMA | SR.MANAGER | MINING | 90277252 | E-6 | BOCP MINES |
11 | MD.H.QURASHI | SR.MANAGER | MINING | 90076779 | E-6 | BOCP MINES |
12 | B. XALXO | SR.MANAGER | PERSONNEL | 90077678 | E-6 | BOCP MINES |
13 | T.P.PANDEY | SR.MANAGER | EXCAVATION | 90068180 | E-6 | BOCP MINES |
14 | GOVERDHAN SHIT | MANAGER | MINING | 90054685 | E-5 | BOCP MINES |
15 | GENALAL SINGH | MANAGER | EXCAVATION | 90200312 | E-5 | BOCP MINES |
16 | CHANDRAJEET KUMAR | ASST. MANAGER | SALES | 90303678 | E-3 | BOCP MINES |
17 | ABHISHEK RASTOGI | ASST. MANAGER | E&M | 90278565 | E-3 | BOCP MINES |
18 | NARAYAN HANSDA | ASST.MANAGER | MINING | 90272832 | E-3 | BOCP MINES |
19 | VAIBHAV KR. SINGH | ASST.MANAGER (EXCV) | EXCAVATION | 90297201 | E-3 | BOCP MINES |
20 | D.D.HAZRA | ASST.MANAGER | MINING | 90209008 | E-3 | BOCP MINES |
21 | G.C.MANJHI | ASST. MANAGER | SURVEY | 90205121 | E-3 | BOCP MINES |
22 | SAURABH KR. SINHA | ASST. MANAGER | EXCAVATION | 90280082 | E-3 | BOCP MINES |
23 | RABINDRA SETHI | ASST. MANAGER | MINING | 90225087 | E-3 | BOCP MINES |
24 | JAYSHANKAR PRASAD | ASST. MANAGER | MINING | 90272889 | E-3 | BOCP MINES |
25 | B. BANDOPADHYAY | ASST. MANAGER | MINING | 90233297 | E-3 | BOCP MINES |
26 | S.K MANDAL | ASST. MANAGER | MINING | 90233289 | E-3 | BOCP MINES |
27 | BHUPENDRA KR.KAUSHIK | SR OFFICER | MINING | 90325184 | E-2 | BOCP MINES |
28 | S.K KONAR | SR.OFFICER | EXCAVATION | 90282617 | E-2 | BOCP MINES |
29 | P.T ROBINSON RAJ | SR.OFFICER | MINING | 90211848 | E-2 | BOCP MINES |
30 | P.K YADAV | SR.OFFICER | EXCAVATION | 90282682 | E-2 | BOCP MINES |
31 | CHIRANJEEV GUPTA | SR.OFFICER | EXCAVATION | 90223819 | E-2 | BOCP MINES |
32 | SACHIN KUMAR | MT | EXCAVATION | 90279569 | E-2 | BOCP MINES |
33 | ASHOK KR. PAL | SR.OFFICER | PERSONNEL | 90292632 | E-2 | BOCP MINES |
34 | C. K. SONI | SR. OFFICER | E & M | 90295741 | E-2 | BOCP MINES |
35 | UTTAM KUMAR | SR.OFFICER | MINING | 90213398 | E-2 | BOCP MINES |
36 | ANJANI KUMAR | SR.OFFICER | MINING | 90211897 | E-2 | BOCP MINES |
37 | VIKASH KUMAR | M.T | E & M | 90313677 | E-2 | BOCP MINES |
38 | YADUNANDAN PASWAN | SR.OFFICER | MINING | 90325713 | E-2 | BOCP MINES |
39 | INDRADEO SINGH | SR. OFFICER | MINING | 90325515 | E-2 | BOCP MINES |
40 | KAMLESH PANDEY | SR. OFFICER | MINING | 90324963 | E-2 | BOCP MINES |
41 | AMIT KR. MAHTO | MT | MINING | 90272899 | E-2 | BOCP MINES |
42 | S.S NATH | SR.OFFICER | MINING | 90211863 | E-2 | BOCP MINES |
43 | Y. PRASAD | SUB.ENGINEER | EXCAVATION | 90255704 | E-1 | BOCP MINES |
44 | S.S YADAV | SUB.ENGINEER | EXCAVATION | 90255613 | E-1 | BOCP MINES |
45 | GANESH KUMAR | SUB.ENGINEER | EXCAVATION | 90246869 | E-1 | BOCP MINES |
46 | R.P SHARMA | SUB.ENGINEER | EXCAVATION | 90255589 | E-1 | BOCP MINES |
47 | R.N.P SINGH | SUB.ENGINEER | EXCAVATION | 90255456 | E-1 | BOCP MINES |
48 | R. THAKUR | SUB.ENGINEER | EXCAVATION | 90255134 | E-1 | BOCP MINES |
49 | PANCHANAN JHA | SUB.ENGINEER | EXCAVATION | 90264193 | E-1 | BOCP MINES |
50 | J.P SINGH | SUB.ENGINEER | EXCAVATION | 90255282 | E-1 | BOCP MINES |
51 | I.R DAS | SUB.ENGINEER | EXCAVATION | 90264482 | E-1 | BOCP MINES |
52 | G.L PRASAD | SUB.ENGINEER | EXCAVATION | 90255233 | E-1 | BOCP MINES |
53 | B.N BANERJEE | SUB.ENGINEER | EXCAVATION | 90255639 | E-1 | BOCP MINES |
54 | B. K. SINGH | SUB.ENGINEER | EXCAVATION | 90264912 | E-1 | BOCP MINES |
55 | A.K RAJAK | SUB.ENGINEER | EXCAVATION | 90255712 | E-1 | BOCP MINES |
56 | AJAY KUMAR | SUB.ENGINEER | EXCAVATION | 90255548 | E-1 | BOCP MINES |
57 | ARUN KUMAR | SUB.ENGINEER | EXCAVATION | 90255159 | E-1 | BOCP MINES |
58 | ASHOK KUMAR | SUB.ENGINEER | EXCAVATION | 90255324 | E-1 | BOCP MINES |
59 | A. BHATTACHARJEE | SUB.ENGINEER | E & M | 90245861 | E-1 | BOCP MINES |
60 | MUKESH KUMAR | SUB.ENGINEER | EXCAVATION | 90255084 | E-1 | BOCP MINES |
61 | ARUN KUMAR | SUB.ENGINEER | EXCAVATION | 90255142 | E-1 | BOCP MINES |
62 | SUNIL KUMAR | SUB.ENGINEER | EXCAVATION | 90255076 | E-1 | BOCP MINES |
JAMUNIA O.C.P | ||||||
SL | NAME OF EXECUTIVE | DESIGNATION | Discipline | PERS. No. | GRADE | POSTING |
1 | KALYANJEE PRASAD | CHIEF MANAGER | MINING | 90129792 | E-7 | JAMUNIA OCP |
2 | K.K.SINGH | SR.MANAGER | MINING | 90062753 | E-6 | JAMUNIA OCP |
3 | SOBHENDU PAL | SR.MANAGER | EXCAVATION | 90054574 | E-6 | JAMUNIA OCP |
4 | K.K DUTTA | MANAGER | MINING | 90203308 | E-5 | JAMUNIA OCP |
5 | DR.SHISHTA SINHA | MEDICAL SUPDT | MEDICAL | 90077058 | E-5 | JAMUNIA OCP |
6 | RAVINDRA KUMAR | MANAGER | MINING | 90080219 | E-5 | JAMUNIA OCP |
7 | ABHAY CHANDRA JHA | MANAGER | EXCAVATION | 90053406 | E-5 | JAMUNIA OCP |
8 | R.A.PRASAD | DY.MANAGER | MINING | 90200452 | E-4 | JAMUNIA OCP |
9 | S.K SUNDARAY | ASST.MANAGER | EXCAVATION | 90211822 | E-3 | JAMUNIA OCP |
10 | IKJOT DHAWAN | ASST.MANAGER | PERSONNEL | 90296773 | E-3 | JAMUNIA OCP |
11 | MANOJ KUMAR | ASST.MANAGER | MINING | 90213406 | E-3 | JAMUNIA OCP |
12 | A.K.SHUKLA | ASST, MANAGER | SURVEY | 90205097 | E-3 | JAMUNIA OCP |
13 | ARUN KUMAR | ASST.MANAGER | E&M | 90278722 | E-3 | JAMUNIA OCP |
14 | JAY PRAKASH | MT | MINING | 90309550 | E-2 | JAMUNIA OCP |
15 | M.P SINGH | SR.OFFICER | MINING | 90213869 | E-2 | JAMUNIA OCP |
16 | P.K. JHA | SR. OFFCER | PERSONNEL | 90292699 | E-2 | JAMUNIA OCP |
17 | ASHLOK KR SINGH | SR.OFFICER | MINING | 90291204 | E-2 | JAMUNIA OCP |
18 | O.P YADAV | SUB.ENGINEER | EXCAVATION | 90264987 | E-1 | JAMUNIA OCP |
19 | B.K MANDAL | SUB.ENGINEER | E & M | 90247232 | E-1 | JAMUNIA OCP |
20 | S.N MISHRA | SUB.ENGINEER | E & M | 90246877 | E-1 | JAMUNIA OCP |
21 | HN ROY CHOUDHURY | SUB.ENGINEER | E & M | 90245929 | E-1 | JAMUNIA OCP |
22 | S.N SINGH | SUB.ENGINEER | MINING | 90242827 | E-1 | JAMUNIA OCP |
23 | RAM BILAS BAITHA | SUB.ENGINEER | EXCAVATION | 90255696 | E-1 | JAMUNIA OCP |
MADHUBAN WASHERY | ||||||
SL | NAME OF EXECUTIVE | DESIGNATION | Discipline | PERS. No. | GRADE | POSTING |
1 | A.K.SINHA | CHIEF MANAGER | COAL PREP. | 90058404 | E-7 | MCW |
2 | S.B.MISHRA | CHIEF MANAGER | COAL PREP. | 90060673 | E-7 | MCW |
3 | D.C.JHA | CHIEF MANAGER | COAL PREP. | 90083782 | E-7 | MCW |
4 | A.K.VERMA | SR.MANAGER | COAL PREP. | 90083881 | E-6 | MCW |
5 | P.K.MOHANTI | SR.MANAGER | COAL PREP. | 90060699 | E-6 | MCW |
6 | S.N.BASU | SR.MANAGER | COAL PREP. | 90071142 | E-6 | MCW |
7 | PRAMOD KUMAR | SR. MANAGER | COAL PREP. | 90076027 | E-6 | MCW |
8 | S.K.VERGHESE | SR.MANAGER | E & M | 90063560 | E-6 | MCW |
9 | ATUL KUMAR | DY.MANAGER | FINANCE | 90057803 | E-4 | MCW |
10 | ANANT MISHRA | ASST. MANAGER | PERSONNEL | 90267659 | E-3 | MCW |
11 | ABHIJEET MAHTO | ASST.MANAGER | E&M | 90278672 | E-3 | MCW |
12 | Dr. N RAI | SR. M.O | MEDICAL | 90277310 | E-3 | MCW |
13 | B. KUMAR | ASST. MANAGER | E & M | 90217340 | E-3 | MCW |
14 | MANISH DUA | M.T | COAL PREP. | 90303314 | E-2 | MCW |
15 | S.S PARIHAR | M.T | COAL PREP. | 90303306 | E-2 | MCW |
16 | S.K DUTTA | SUB.ENGINEER | EXCAVATION | 90264177 | E-1 | MCW |
17 | D.R PAUL | SUB.ENGINEER | E & M | 90245945 | E-1 | MCW |
18 | N.K PATRA | SUB.ENGINEER | E & M | 90245648 | E-1 | MCW |
19 | K.L CHOWDHRY | SUB.ENGINEER | EXCAVATION | 90264292 | E-1 | MCW |
20 | B. PRASAD | SUB.ENGINEER | CIVIL | 90237777 | E-1 | MCW |
SL | Name | Union | Mobile no |
1 | Sri SurendraYadav | RCMS | 9835365275 |
2 | Sri Devi Sharma | RCMS | 9431386590 |
3 | Sri BaijnathYadav | RCMS | 9835571586 |
4 | Sri Jogendra Singh | DCKS | 9835370689 |
5 | Sri Gopal Mishra | JMS | 9470595988 |
6 | Sri G C Sharma | UCWU | 7209970210 |
7 | Sri U P Singh | KIMP | 9031259125 |
8 | Sri R.P Singh | BCKU | 9835736394 |
9 | Sri M. Dubey | BJKMS | 9939121894 |