SIJUA AREA

SIJUA AREA

History
The history of Jharia Coalfield was started since nineteenth century. The only energy during those years. the mining was carried out through manual and sem-manual methods resulting into large scales degradation of India, forests and environment. The unscientific mining resulted into large mine-fires, subsidence and land degradation. The mines of jharia Coalfields were taken over by BCCL from the erstwhile Private mine worriers. Most of the mines had their history from pre-nationalization period.
During the takeovers of the mines in 1972 in BCCL from private mine owners, the data line leasehold area, underground mine planning.
Production capacity was unknown. However, most of the mines were further re-organized.
Most of the mines are contiguous in nature and the environmental impact is overlapping in ambient environment due to cumulative effect of the mining activities
Total Reserve and Lease Hold Area
Colliery
Total Reserve (In Mi/Te.)
Lease hold Area (In Hectare)
Mudidih
178.327
378.05
Kankanee
57.12
258.12
Loyabad
64.593
499.56
Bansdeopur
50.252
104.72
Sendra Bansjora
87.05
249.63
Tetulmari
51.839
317
Nichitpur
10.504
150
Area Total
499.685
1957.08
FIVE YEARS PRODUCTION FROM 2005-06 TO 2009-10
       
Colliery2005-062006-072007-082008-092009-10
MudidihUG9159392308936069889795367
OC     
H.HEMM5250821214819670556612176745
Total144101304456290311155509272112
KankaneeUG1029457555823571  
OC     
H.HEMM  32935393935812695
Total1029457555856506393935812695
LoyabadUG67196588245200947675 
OC   8730 
H.HEMM     
Total671965882452009564050
BansdeopurUG6539362308568477165095507
OC     
H.HEMM159357 2089218966541755
Total2247506230877739261315137262
S.BansjoraUG205623199725201429179805133806
OC323228277787309492288790112056
H.HEMM 14524   
Total528851492036510921468595245862
TetulmariUG106428108546125157128608108413
OC373450435638302580469378680204
H.HEMM     
Total479878544184427737597986788617
NichitpurUG     
OC623326694129705247683956643472
H.HEMM 77367   
Total623326771496705247683956643472
Area totalUG639178597269552619526635433093
OC13200041407554131731914508541435732
Departmental19591822004823186993819774891868825
H.HEMM2118653040392505326402121031195
Grand Total21710472308862212047026177012900020
PROFITABILITY
        
FINANCIAL PERFORMANCE OF SIJUA AREA
        
Sl.Head2014-152015-162016-172017-182018-192019-20
1Production of Coal (Te.)2696315279180629631526318833330652870494
2Overall O.M.S. (Te.)2.452.73.043.64.874.55
3E.M.S.    (Rs.)2880.723028.763596.963692.334304.394557.49
4Profit/Loss (In Crores)27.56231.4019-72.8735-47.0256333.2248188.3156
 Overall (Rs. In Crores)27.56231.4019-72.8735-47.0256333.2248188.3156
 
Anchor
TARGET FOR THE YEAR 2010:-
        
Sl.Name of Mines200520062007200820092010
1MUDIDIH139238229141287107
2KANKANEE1542431551261085
3LOYABAD17919819521226957
4BANSDEOPUR9516810118018545
5S/BANSJORA256438529478341173
6TETULMARI18853440429238974
7NICHITPUR248157105223315115
8R.H. LOYABAD05400533
9AREA OFFICE01947070
TOTAL12592049176516521954579
        
        
 Note: I.M.E. of Contractor workers done in 2008:- 306  
        
 Note: I.M.E. of Contractor workers done in 2009:-  132  
        
 Note: I.M.E. of Contractor workers done in 2010:- 54 (Upto April ’10)
ANNUAL HRD PLAN FOR THE YEAR 2010-11
           
           
Sl No.Type Of TrainingTarget for 2010-11
1BasicAll new employees
2Refresher800
3  REORIENTATION As & When Required
 Special TrainingGAS TESTING   50
   TIMBER MISTRIES  20
   SHOT- FIRING   20
   PERSONS HANDLING EXP. 20
   CHANGE OF JOB  200
   OTHERS   20
   SUB-TOTAL   1130
 SAFETYST.TRNG.FOR TECH SUP. 15
 CONFERENCEFIRE FIGHTING   20
 RECOMMEN-ROOF SUPPORT  40
 DATIONSOLID BLASTING  20
   WORKMEN INSPECTOR   
   SAFETY COMMITTEE  20
   A/B DUST SURVEY  20
   HEMM WORKER  20
   CC FOR MS EXAM  40
   CONTRACTOR WORKER 100
   OTHER      
   SUB-TOTAL   295
   GRAND TOTAL   1425

FUTURE PLANNING OF SIJUA AREA

CollieryFuture Planning
MudidihAfter removing fire effected upper seams upto X seam by OCP method and refilling with incumstible material, drifting will be done from floor of X seam to lower seams and coal will be extracted by UG method with advanced mining technology
Kankanee
BansdeopurAfter removing coal upto X seam by Opencast method, drifting will be done to lower seams and coal will be extracted by UG method with advanced mining technology.
Sendra BansjoraAfter removing fire affected VIII B/VIII seam and upto IV seam by opencast method, coal from III and II seam will be extracted from UG method with advanced mining technology.
TetulmariAfter removing coal upto IV seam by opencast method, coal from III and II seam will be extracted from UG method with advanced mining technology.

MANPOWER

UNITWISE OCP/UG/SURFACE MANPOWER FOR THE MONTH OF MAY-2020

Colliery wise fatal/ Serious/Reportable accident Jan.2015 to May 2020.
STATUS OF FIRE SITES OF NRSC IN SIJUA AREA
SL. NO
As per NRSC Records
 Concerned Area
Colliery Name
Patch Name
Affected area
 (Sq Km)
LTH
NON LTH
Status
No
Colliery
1
69
Kankanee
Sijua
Kankanee
H-HEMM Patch D
0.1215
02
514
Under evaluation
2
35
SendraBansjora
Sijua
S Bansjora
Near H-HEMM Patch X
0.0275
63
470
To be ascertained by NRSC study, Present site on OB Dump
3
72
Loyabad
Sijua
Loyabad
0.0063
246
3415
To be ascertained by NRSC study
4
70
Mudidih
Sijua
Mudidih
0.1104
165
2164
Under 22/12 Bastee
ABOUT SAFETY DRIVES
A special Safety Drive on support at faces, travelling and haulage roadways was conducted in the UG mines of BCCL/Sijua Area from 26.10.2009 to 31.10.2009.
Annual Safety Week was celebrated in all mines of BCCL/Sijua Area between 11.01.2010 and 16.01.2010. Inspections teams constituting Senior Officers of different Areas have inspected all the mines of Sijua Area during this period.
Officers from DGMS and ISO also took part in this programme.
GRIEVANCE REDRESSAL
Grievance Redressal Cells are already constituted at unit level and Area level. Grievances received from workman are being redressed within 15 days at unit level with the information to the employee. Grievances at Area level are being redressed at Area/HQ level within a month with intimation to the person concerned.
A separate Cell has been constituted for redressal of grievances of dependants of ex-employees died in mine accidents.

(TRADE UNION REPRESENTATIVES)

    

Sl.No.

NAMEORGANIZATION

MOBILE NO.

1

Shri N.K. SharmaRCMS9470595872
2Shri Ram Prit PrasadRCMS

9431728507

3

Shri Ravi ChoubeyRCMS9471561929
4Shri Rameshwar SinghJMS

9334018642

5

Shri Arun VermaJMS7870771272
6Shri Ram Ratan SinghDCKS

8757018696

7

Shri P. MurlidharanBJKMS9430134366
8Shri K.B. SahayCSS

9431507941

9

Shri Nagendra Pd. VermaBCKU9431119062
10Shri Md. SharifUCWU

9431375668

Budget certification given for supply of drhttp://203.153.38.3/inking water/pit water during 2011-12.
Budget certification given for cleaning of drain, removing of garbage during 2011-12.
C.S.R. Activities:
In 09-10 we have done following C.S.R. activities:-
a)Construction of Jai Prakash Ashram at Sijua.
b)Construction of one well at Saraitand Basti.
c)Construction of Community Centre at Jagyashalla at Sendra Bansjora Basti.
Beside the above, water supply has been provided through pipes in following villages:
Nimiatand Basti, Majar Basti, New Pandeydih Basti and Chandore Basti.
Welfare Activities:
The following Welfare Activities done in 09-10:-
a)Repairing of quarters done for approx. 1200 quarters.
b)Water supply through pipe lines arranged in different colonies of Sijua Area.
c)Township maintenance works like ash/garbage cleaning, sanitation, septic tank repair etc.
Road and drain repair works done.
d)Welfare building works like Hospital, Guest House, Community Centre etc. done.
C.S.R. ACTIVITIES
1.Medical Facility:-
Provides OPD facility in different villages in nearby area. Medicines are also given.
In hospital this facility ia also provided. Routine immunization done. Medical camps
for Diabetes, Hypertension etc., are arranged. Medical aid to epidemic Victims are provided.
Eye camp, Ligation camp are arranged wellness clinic is also arranged.
In the month of May ’10          CSR                            138  persons treated
Wellness Clinic                  37  persons treated
Mobile Van                         494  persons treated
2. Baby Show arranged.
Rehabilitation & Resettlement Status
1. We have already provided 282 employments to the land losers.
2.We have shifted from  Pandedih bastee, Beldari Bastee, Chandore bastee & Nichitpur Bastee and
rehabilitation site has already been provided.
3.We are assisting PAP to establish non-farm self employment through the provision of
infrastructure formation of co-operatives , jobs with contractors etc. where feasible.
CULTURAL ACTIVITIES
Sports and cultural activities:-
Sijua Area is having fully developed and equipped stadium as per norms and standard.
All India Public Sector Football tournaments, CIL Inter Company Football
Tournament and All India Invitation Football tournament has been held in Sijua Stadium.
Coal India Football Academy has been inaugurated in the Stadium
Teams participating in different tournament are as follows:
1.      Sijua Area Football Team.
2.      Sijua Area Cricket Team.
3.      Sijua Area Kabbadi Team.
4.      Sijua Area Volley ball Team.
5.      Sijua Area Athletic Team.
PERIODICAL MEDICAL EXAMINATION (P.M.E.) REPORT
PME Report 2013
PME Report 2014
PME Report 2015
PME Report 2016
PME Report 2017
PME Report 2018
PME Report 2019
PME Report 2020
ABOUT SAFETY DRIVES
A special Safety Drive on support at faces, travelling and haulage roadways was
conducted in the UG mines of BCCL/Sijua Area from 26.10.2009 to 31.10.2009.
Annual Safety Week was celebrated in all mines of BCCL/Sijua Area between
11.01.2010 and 16.01.2010. Inspections teams constituting Senior Officers of different
Areas have inspected all the mines of Sijua Area during this period.
Officers from DGMS and ISO also took part in this programme.
GRIEVANCE REDRESSAL
Grievance Redressal Cells are already constituted at unit level and Area level.
Grievances received from workman are being redressed within 15 days at unit level
with the information to the employee. Grievances at Area level are being redressed
at Area/HQ level within a month with intimation to the person concerned.
A separate Cell has been constituted for redressal of grievances of dependents
of ex-employees died in mine accidents.