-->
Colliery wise fatal/ Serious/Reportable accident Jan.2015 to May 2020.
STATUS OF FIRE SITES OF NRSC IN SIJUA AREA
SL. NO |
As per NRSC Records |
Concerned Area | Colliery Name | Patch Name | Affected area
(Sq Km) |
LTH | NON LTH |
Status |
|
No |
Colliery |
||||||||
1 |
69 | Kankanee | Sijua | Kankanee | H-HEMM Patch D | 0.1215 | 02 | 514 | Under evaluation |
2 | 35 | SendraBansjora | Sijua | S Bansjora | Near H-HEMM Patch X | 0.0275 | 63 | 470 |
To be ascertained by NRSC study, Present site on OB Dump |
3 |
72 |
Loyabad | Sijua | Loyabad | – | 0.0063 | 246 | 3415 | To be ascertained by NRSC study |
4 |
70 |
Mudidih |
Sijua |
Mudidih |
– |
0.1104 |
165 |
2164 |
Under 22/12 Bastee |
ABOUT SAFETY DRIVES
A special Safety Drive on support at faces, travelling and haulage roadways was conducted in the UG mines of BCCL/Sijua Area from 26.10.2009 to 31.10.2009.
Annual Safety Week was celebrated in all mines of BCCL/Sijua Area between 11.01.2010 and 16.01.2010. Inspections teams constituting Senior Officers of different Areas have inspected all the mines of Sijua Area during this period.
Officers from DGMS and ISO also took part in this programme.
GRIEVANCE REDRESSAL
Grievance Redressal Cells are already constituted at unit level and Area level. Grievances received from workman are being redressed within 15 days at unit level with the information to the employee. Grievances at Area level are being redressed at Area/HQ level within a month with intimation to the person concerned.
A separate Cell has been constituted for redressal of grievances of dependants of ex-employees died in mine accidents.
© 2009-10 Bharat Coking Coal Limited | All rights reserved | Maintained by EDP Department | Disclaimer | Privacy |