Total Reserve and Lease Hold Area
Colliery Total Reserve (In Mi/Te.) Lease hold Area               (In Hectare)
Mudidih 178.327 378.05
Kankanee 57.120 258.12
Loyabad 64.593 499.56
Bansdeopur 50.252 104.72
Sendra Bansjora 87.050 249.63
Tetulmari 51.839 317.00
Nichitpur 10.504 150.00
Area Total 499.685 1957.08

COLLIERIES INCLUDING HIRED HEMM PATCHES

The Sijua Area lies South of Grand Chord Railway 12 Km. from Dhanbad Railway
Station. It is on the West of Ekra Jore and East of Angarpathra. The
Dhanbad-Chandrapura Railway Line crosses at the middle from East to West. The
Area has three Open Cast Mine & four Underground mines, three Hired HEMM
patches.

Colliery OCP Hired HEMM Patch

  1. Mudidih               Sendra Bansjora OCP            Kankanee
  2. Bansdeopur                Tetulmari OCP               Mudidih (Jogta)
  3. Tetulmari                   Nichitpur OCP                Tetulmari West
  4. Sendra Bansjora

The metallurgical coal is obtained from Kankanee and Mudidih Colliery. All
these Underground mines are very old, mostly developed in multi section, watery
and infested with problems of fire.

Details of Hired HEMM Patches.

  1. Kankanee: M/S Brahamaputra Infrastructure Ltd., was awarded work vide
    Work Order No. CGM/SA/Hiring HEMM/KAN/07/434 dtd. 17.12.2007. for removal of
    OB  374.70 Lakh Cu.Mt  and extraction & transportation of coal 47.5 Lakh
    Metric Tonne. in 72 months.
  2. Mudidih (Jogta): M/S Dhansar Engineering Company Pvt. Ltd. was awarded
    vide Work Order no. GM/SA/Plg./DECO/09/577 dtd. 19.06.2009, for removal of
    OB 285.18 Lakh Cu. Mt. OB and extraction & transportation of coal 23.04 Lakh
    Metric Tonne in 72 months.
  3. Tetulmari (West): M/S BKB Transport Pvt. Ltd. was awarded vide Work
    Order no. GM/SA/Plg./HEMM/BKB/10/104 (B)  dtd. 23.04.2010, for removal of OB
    50.79 Lakh Cu. Mt. OB and extraction & transportation of coal 28.55 Lakh
    Metric Tonne in 30 months.