Performance

Production details of last 5 years.

2005 – 2006 2006 – 2007 2007 – 2008 2008 – 2009 2009 – 2010
2400358 2249617 2186800 2097468 2236834
Profit / Loss Figure
Year Amount
2007 – 2008 (-) Rs.743236.00
2008 – 2009 (-) Rs.2385583.00
2009 – 2010 (+) Rs.381379.00

PME synopsis of Last 5 Years

2006 2007 2008 2009 2010
1217 2835 1556 1337 2260

Status of Vocational Training.

2006-07 2007-08 2008-09 2009-10
1145 1030 1155 1409

Contractor’s Worker Training

2007-08 2008-09 2009-10
69 120 240

Future Planning

It has been Planned to open 6 M.T.Y Mega O.C.P Covering the whole area of NT-ST and Jeenagora OCP.  The Project report of above mega OCP has been prepared by CMPDIL and it is on the verge of being approved.  In the draft report the IRR envisaged a targeted capacity of 6 M.T.Y in two variants.

Variant – I  with departmental  HEMM

Variant –  II Contractually

The proposed method of mining is conventional that is Shovel- Dumper Combination.  The CMPDIL has recommended for the implementation of variant – II because IRR at 85 % Capacity utilisation is 78.34 % in Comparision to 17.11 % in variant – I.

A Mega U/G Mine of 1 M.T.Y has also been planned by mechanised method covering the area of  Lodna, NTC and some part of Joyrampur.

In near future it has been planned to open an additional district at NTC, Joyrampur, and Lodna Colliery by deploying 1,2,3 SDL respectively for boosting of production of the Lodna Area from Present 1000 TPD to 1500 TPD (U/G).